Flats from the factory. With a bathroom.

In 1961 almost three in four Viennese flats had no bathroom, and skilled workers were missing. So the city built a hall in Kagran, cast the walls lying flat in heated moulds and erected them on the building site next door: flats from the factory, each with a bathroom. Here are the sources for the video, statement by statement.

Also onInstagramTikTokYouTube

Video · 2:03 · with sound, in German

What the video shows

In 1961 the building industry was fully booked, skilled workers were missing, and walls were built, as Mayor Jonas said on the radio, “wie es schon die alten Römer machten” (as the old Romans did). So the city turned to the system of the French engineer Raymond Camus: on 3 May 1962 the factory of Montagebau Ges.m.b.H. started in Kagran, right next to the first building site. Walls and floors were cast lying flat in 24 heated moulds, with the window frames cast in, in winter too and above all by trained-up unskilled workers.

The first estate, twelve four-storey rows and three high-rises with 861 flats, got its first residents at the end of 1962. Every flat had a bathroom, the larger ones just over 70 square metres, the estate district heating. Even in council housing only one flat in three had a bathroom at the time. In 1964, according to the city, the walls of a block stood in 19 working days; in December 1965 the 100,000th panel hung on the crane.

The factory only paid off on large building sites, with at least 300 flats in one place and floor plans as alike as possible, Jonas said in 1961; critics said the crane dictated the plan. So building took place mainly in the north, near the factory: we count at least 16 estates with 13,745 flats in Floridsdorf and the Donaustadt, and by 1970 the city counted ten thousand flats. But large fields became rare, critics found the estates monotonous and poorly connected, from 1972 more money went into the old city, and in 1983 panel production ended. None of these estates was demolished; they were insulated.

Real in the video are the five photos from the Vienna City and Provincial Archives, the City of Vienna’s 1956 and 1976 aerial photos and Google’s 3D of today. The buildings in the 3D stand on the City of Vienna’s building model; panels, walls, cranes, time-lapse, bricklayers and wall panel are diagrams, the map shows our count. At the end the video asks: “Kennst du jemanden, der in einer Wohnung aus der Fabrik gewohnt hat? Oder warst du es selbst?” (Do you know someone who lived in a flat from the factory? Or was it you?) We collect memories, not addresses.

Sources and image credits

Data

For the film we cropped, converted and redrew the data.

Google 3D

the insulated south façade of one row today, as a panel in the column; over it the grid of the panels appears in gold (our own measurement: 24 bays, 4 storeys, south side only): Google’s photorealistic 3D. In the film the credit stays in the picture for as long as Google’s image is visible: Bild: Google Maps

Pictures

  1. Press and Information Service of the City of Vienna, Montagebau Kagran: Baustelle der Werkshalle (the factory hall under construction, steel frame), 12.10.1961. Vienna City and Provincial Archives, AT-WSTLA 3.3.11.FC1.61459, picture 8; source: WStLA. Licence: CC BY-NC-ND 4.0. Change: crop from the album page, the photo whole and unaltered, only reduced in size (ND); the print lands on the table under “Also baute die Stadt eine Halle.” (So the city built a hall.). On screen “Foto: WStLA · CC BY-NC-ND 4.0” and the date.
  2. Press and Information Service of the City of Vienna, Montagebau Kagran: Inbetriebnahme der Montagebaufabrik Kagran (concrete is poured into the horizontal mould), 3.5.1962. Vienna City and Provincial Archives, AT-WSTLA 3.3.11.FC1.62168, picture 4; source: WStLA. Licence: CC BY-NC-ND 4.0. Change: crop from the album page, the photo whole and unaltered, only reduced in size (ND); the print lands under “Dort goss man die Wände” (there the walls were cast). On screen “Foto: WStLA · CC BY-NC-ND 4.0” and the date.
  3. Press and Information Service of the City of Vienna, Montagebau Kagran: Inbetriebnahme der Montagebaufabrik Kagran (a finished panel is tilted out of the mould), 3.5.1962. Vienna City and Provincial Archives, AT-WSTLA 3.3.11.FC1.62168, picture 1; source: WStLA. Licence: CC BY-NC-ND 4.0. Change: crop from the album page, the photo whole and unaltered, only reduced in size (ND); the print lands under “liegend, in beheizten Formen” (lying flat, in heated moulds); its edge then becomes the mould in the diagram. On screen “Foto: WStLA · CC BY-NC-ND 4.0” and the date.
  4. Press and Information Service of the City of Vienna, Montagebau Kagran: 100.000. Fertigteilbauplatte (the panel inscribed “100.000 PLATTE” with a garland on the crane), 7.12.1965. Vienna City and Provincial Archives, AT-WSTLA 3.3.11.FC1.65716, picture 2; source: WStLA. Licence: CC BY-NC-ND 4.0. Change: crop from the album page, the photo whole and unaltered, only reduced in size (ND); the print lands under “1965 hing Platte Nummer 100.000 am Kran.” (In 1965 panel number 100,000 hung on the crane.). On screen “Foto: WStLA · CC BY-NC-ND 4.0” and the date.
  5. Press and Information Service of the City of Vienna, Montagebau Kagran: Anbringung des letzten Bauelements (a floor panel hangs from four cables above the first block), 3.10.1962. Vienna City and Provincial Archives, AT-WSTLA 3.3.11.FC1.62391, picture 5; source: WStLA. Licence: CC BY-NC-ND 4.0. Change: crop from the album page, the photo whole and unaltered, only reduced in size (ND); the print lands in the pause before the closing question. On screen “Foto: WStLA · CC BY-NC-ND 4.0” and the date.

AI, voice and music

No AI picture. Drawn or computed are our own 3D (buildings from the building model, panels, cranes, time-lapse as a diagram), the bricklayers and the wall panel (diagram), the number panels, the floor plan type C after the Handbuch der Stadt Wien 1965, the room-and-kitchen flat around 1900 as a diagram and the map of the estates (our own count). Voice: Julien El-Bahy, one of the two people behind wohnwahn. Music: Lyria 3 Pro (Google), via OpenRouter. Sound effects (crane, bricks, paper): ElevenLabs.

Each statement in the film and its sources

  1. “Wohnungen aus der Fabrik. Mit Bad. Denn fast drei von vier Wiener Wohnungen hatten 1961 keins.” (Flats from the factory. With a bathroom. Because almost three in four Viennese flats had none in 1961.) On screen: our own 3D, a floor panel is set down, the estate grows (diagram), then the panel “fast 3 von 4 · Wiener Wohnungen ohne Bad · 1961”.

    “Flats from the factory” is an image: walls and floors were cast in the hall and erected on site. The construction scene at the beginning is a diagram (order, pace, position of the cranes); for 1964 three assembly cranes are documented, so never more than three work at once.

  2. “Neue bauen? Die Baufirmen waren ausgelastet, Facharbeiter fehlten. Und gemauert wurde, sagte Bürgermeister Jonas, wie bei den alten Römern. Ziegel auf Ziegel.” (Build new ones? The building firms were fully booked, skilled workers were missing. And walls were laid, said Mayor Jonas, as in the days of the old Romans. Brick on brick.) On screen: three bricklayers at a brick wall (tile “Wien, 1961 · herkömmlich gebaut · Schema”), two turn into outlines; the panel quoting Jonas.

    Jonas used the quote to describe the usual way of building at the time. The bricklayers and the wall are a diagram without dimensions; “two of three missing” is an image, not a figure.

  3. “Also baute die Stadt eine Halle. Dort goss man die Wände, liegend, in beheizten Formen. Die Fensterrahmen waren schon einbetoniert.” (So the city built a hall. There the walls were cast, lying flat, in heated moulds. The window frames were already set in the concrete.) On screen: the photos of 12 October 1961 and 3 May 1962, then the tile “Die Wandplatte · Schema” (the wall panel · diagram) with the window frame in gold.

    The builder was Montagebau Ges.m.b.H., in which the city held a stake; hence “the city”. Frames were cast into the panels, not pipes (in 1961 the city mentions slots for installations).

  4. “Gegossen wurde auch im Winter. Und vor allem von angelernten Hilfsarbeitern.” (Casting went on in winter too. And above all by trained-up unskilled workers.) On screen: the hall in winter (diagram), two unskilled workers fill the bricklayers’ outlines.

    “Above all” rather than “almost only”: “almost exclusively” is only said by councillor Heller in 1964; the handbook speaks of a “much greater extent”.

  5. “1964 standen die Wände eines Blocks mit gut 30 Wohnungen in 19 Arbeitstagen, so die Stadt. 1965 hing Platte Nummer 100.000 am Kran. Mit Girlande.” (In 1964 the walls of a block with just over 30 flats stood in 19 working days, according to the city. In 1965 panel number 100,000 hung on the crane. With a garland.) On screen: our own 3D, a row grows, tile “Tag 1” to “Tag 19”; the photo of 7 December 1965.

    The 19 working days apply to the walls, i.e. the shell, not to a ready-to-occupy building; that is why the 3D shows empty window openings. Only the city gives the number; the literature repeats it. The source does not say which row was built in 1964.

  6. “Die größeren Wohnungen hatten gut 70 Quadratmeter. Alle hatten ein Bad. Und Fernwärme. Selbst im Gemeindebau hatte damals, so die Stadt, erst jede dritte Wohnung ein Bad.” (The larger flats had just over 70 square metres. All had a bathroom. And district heating. Even in council housing, according to the city, only one flat in three had a bathroom at the time.) On screen: floor plan type C next to a room-and-kitchen flat around 1900 at the same scale; the panel “erst 1 von 3”.

    Just over 70 m² applies to type C flats (510 of 861); the other 351 of type B had 56 m². District heating is documented for the estate; whether the plant was running at the first move-in at the end of 1962 we do not know, and the film does not say so. The flat around 1900 is a diagram after the range of 25 to 28 m² for a room and kitchen.

  7. “Aber die Fabrik rechnete sich nur auf großen Baustellen. Mindestens 300 Wohnungen auf einem Fleck, sagte Jonas 1961. Und alle möglichst gleich. Kritiker sagten, der Kran bestimme den Plan.” (But the factory only paid off on large building sites. At least 300 flats in one place, Jonas said in 1961. And all as alike as possible. Critics said the crane dictated the plan.) On screen: the 1956 aerial photo with the estate’s blocks in gold, the rows rise (1976), then a crane on its track beside a row (tile “Kranbahn · Schema”, crane track · diagram).

    The crane track on screen is a diagram; it is documented in the photo of 3 October 1962. No source says the crane set the spacing of about 25 metres between the rows, so the film does not say so. The light scene of earlier versions (midday shadow on 21 December) is no longer in the film.

  8. “Gebaut wurde vor allem im Norden, nahe der Fabrik, in Floridsdorf und der Donaustadt. Bis 1970 zählte die Stadt zehntausend Wohnungen.” (Building took place mainly in the north, near the factory, in Floridsdorf and the Donaustadt. By 1970 the city counted ten thousand flats.) On screen: the map, the estates appear in gold by start of construction 1962 to 1972, tile “Aus der Fabrik · mindestens 16 Anlagen · eigene Zählung” (from the factory · at least 16 estates · our own count).

    “Mainly in the north”, not “only”: the literature also counts the Per-Albin-Hansson-Siedlung Ost in Favoriten as prefabricated; its estate page does not name the building method, so it is missing from our count and the map. The map shows position and size, no addresses.

  9. “Doch große Felder wurden selten. Ohne sie, hatte Jonas schon 1961 gewarnt, würde sich die Methode totlaufen. Kritiker fanden die Siedlungen eintönig und schlecht angebunden. Und ab 1972 floss mehr Geld in die alte Stadt. Anfang der Achtziger war Schluss.” (But large fields became rare. Without them, Jonas had warned as early as 1961, the method would run itself into the ground. Critics found the estates monotonous and poorly connected. And from 1972 more money went into the old city. In the early eighties it was over.) On screen: the quote panel, the timeline “Plattenfertigung in Wien” (panel production in Vienna) 1962 to 1983.

    “More money”, not “the money”: the turn to urban renewal came gradually, and large estates were still built on the edge of the city. The criticism applied to the large estates of those years in general. What is documented is the end of panel production in Vienna, not the year the Kagran factory closed.

  10. “Seit der Dämmung, schreibt Wiener Wohnen, sieht man hier die Platten nicht mehr. Abgerissen wurde in Wien keine Siedlung aus der Fabrik.” (Since the insulation, writes Wiener Wohnen, you can no longer see the panels here. No estate from the factory was demolished in Vienna.) On screen: Google’s 3D of the south façade today, the grid of the panels appears in gold, label “Die Platten, unter der Dämmung” (the panels, under the insulation).

    The grid is our own measurement (plan in the 1965 handbook and photo of 3 October 1962): 24 bays, 4 storeys, only on the south side of one row; the storey height is estimated. Sources as of 2020 and 2023.

  11. At the end the question: “Kennst du jemanden, der in einer Wohnung aus der Fabrik gewohnt hat? Oder warst du es selbst? Erzähl uns, wie es dort war.” (Do you know someone who lived in a flat from the factory? Or was it you? Tell us what it was like.) On screen: the photo of 3 October 1962, then the map with all estates under the question.

    We are asking for memories, not addresses: please no address, staircase or house number in the comments. We cannot say for sure who is in the photo of 3 October 1962.

Literature and sources

How wohnwahn measures