3 Rooms | Naturally Outside | BF 14A | Investor | Village in the Third | Completion 2027
What defines this flat
- Stephansplatz≈ 13 min
- Traffic noiseelevated
- Greenpark 112 m away
- Future transitTram 18 around 2026
Tip: Save work, university & co in your profile ("My places") and your route shows up here automatically.
Description from the provider
Living IN the Village IN the Third
In the third district of Vienna, the Village IN the Third is being developed as a new piece of the city - one of Vienna's largest urban development areas. Over eleven hectares are being developed by ARE Austrian Real Estate together with the City of Vienna and wohnfonds_wien into a lively, almost car-free quarter with around 2,000 apartments, office and commercial spaces, childcare, educational institutions, and local supply.
The green heart is formed by the Bert Brecht Park, which spans over 2 hectares - an oasis for relaxation, encounters, and play. All roofs that are not accessible will be greened. Sharing offers, shopping opportunities, and gastronomy are right at your doorstep. Sustainability, short distances, and high quality of life are the guiding principles of this new neighborhood.
With the slogan "naturally outside," Baufeld 14A embodies this idea in a special way: spacious outdoor areas, intelligent architecture, sustainable energy supply - living in the middle of Vienna, in harmony with nature.
Architecture that shapes open space
The building complex consists of two trapezoidal structures connected by the underground garage on the first basement level. A total of 126 freehold apartments will be created, complemented by a commercial unit, 65 parking spaces, and numerous bicycle parking spaces. Each apartment also has a storage room assigned to it.
Generously and friendly designed entrances welcome residents and lead into spacious staircases. Cutouts in the upper floors and wide stairwells bring daylight deep into the common areas. Greened open space zones in front of the apartments, as well as textile sun protection on the balcony fronts, make an important contribution to summer heat protection. A biodiversity concept on the green roofs creates new habitats for birds and insects.
Architectural highlights
Rhythmically structured facades with wood and brick elements - modern, light, and timeless
Balconies and loggias directly accessible from almost all living spaces, with sun protection screens and generous depth
Green open space zones in front of the apartments as natural climate buffers
Green roofs with biodiversity concept - habitat for birds and insects
Inviting entrances and staircases, flooded with light through cutouts and stairwells
The architecture conveys spaciousness while simultaneously creating a sense of security - perfect for an urban home paired with a connection to nature.
Overview
126 freehold apartments
1 commercial unit
65 underground parking spaces, partially prepared for e-mobility
Bicycle and cargo bike parking spaces, cellar compartments
All apartments with outdoor areas
Completion: expected in 2027
No agent fee for buyers
Living quality down to the detail
Each apartment is designed to adapt to the daily lives of its residents - functional, high-quality, and with a feel-good factor.
Equipment overview
Noble parquet floors in all living areas
Tiled bathrooms with floor-level showers or bathtubs
Wood-aluminum windows with triple insulating glazing
External sun protection at all windows
WK3 security doors and video intercom system
Private outdoor areas: balcony, loggia, terrace, or private garden
Common room with adjoining terrace, garden, WC, and kitchen
Children's playground "Spiel-Hain" with adjacent community gardens
Energy with a future
The entire quarter relies on an innovative energy network that connects buildings and optimizes energy flows. Baufeld 14A will also become a showcase project for sustainable supply:
Geothermal probes in combination with heat pumps provide energy for room heating in winter and for temperature control (base cooling) in summer.
Photovoltaic systems on the roof generate renewable electricity.
Underfloor heating on the ground floor and component activation in the upper floors (via the ceilings of the respective upper floors) ensure a balanced indoor climate.
Continuous fresh air supply is ensured by pendulum ventilation with heat recovery.
District heating connection supports supply during peak times as well as hot water preparation.
This creates a combination of living comfort, energy efficiency, and ecological responsibility - an added value for residents.
ARE
ARE is one of the largest real estate companies in Austria and has already realized some of Vienna's most prominent construction projects - including the renovation of the historic Palais Epstein on the Ring and the striking TrIIIple Towers on the Danube Canal. The Village IN the Third also joins this series of innovative projects.
Location
Otto-Preminger-Straße 16, 1030 Vienna, Landstraße
Hilde-Güden-Promenade 7, 1030 Vienna, Landstraße
Location - Urban AND Green
Directly at the approximately 2-hectare Bert Brecht Park - nature and recreation at your doorstep
Tram: Line 18 (Wildgansplatz, 2 min.), Line 71 (St. Marx, 3 min.)
New tram line 18: expected to provide a direct connection from Schlachthausgasse (U3) to U2 Stadion from autumn 2026 - thus new direct access to the green Prater
S-Bahn: Station St. Marx (2 min.), Quartier Belvedere (15 min.)
U-Bahn: U3 Schlachthausgasse (15 min.), U1 Hauptbahnhof (15 min.)
Vienna Central Station: 7 minutes by tram
City Stephansplatz: reachable in about 20 minutes
Motorway A23, exit Landstraße Gürtel / St. Marx: 3 minutes
Vienna Airport: approximately 30 minutes by car or rapid transit
Local supply & leisure
Shopping and gastronomy in the quarter
Diverse shopping opportunities in the Rennweg Center, "The Mall" Wien Mitte, and at the main train station
Cultural highlights: Belvedere, Botanical Garden, Stadtpark, Hundertwasserhaus, event hall in Neu Marx
Recreation within walking distance: Schweizergarten, Danube Canal, Prater
For more information about the apartments, also online at: https://villageimdritten.at/wohnungsfinder/
Additional costs
3.5% property transfer tax
1.1% land register entry fee
0.5% contract creation costs, min. EUR 2,500.00 (plus 20% VAT)
Cash expenses account: EUR 600.00 (including 2
Automatically translated from the provider’s German description.
Key facts
Price per m²: calculated by wohnwahn.
Features
Dashed outline: stated in the description, not confirmed as a data field.
Floor plan
How the provider drew the flat. Tap to enlarge.
What we know about this location
Measured, dated and traceable. You will not find these figures in a listing.
The area · lively and loudEveryday errands work on foot here: supermarket 2 min away, cafés and shops around the corner. The price stands right next to it: traffic and activity outside the door, into the evening. Built form here: New build.
Source and method
What this area offers
Meets 5 of 5 everyday criteria
The nearest places within walking distance, by category.
Nearby facilities cannot be loaded right now. The data source is temporarily unavailable, please try again later.
Loading …
Public transport nearby
Nearby stops cannot be loaded right now. The data source is temporarily unavailable, please try again later.
- Loading stops …
Source and method
Your commute from here
Enter your address (work, university, family) to see the travel time from here, by transit, bike, on foot and by car.
Traffic noise
elevated60–64 dB by day, 55–59 dB at night
road traffic and rail or tram and motorway. Bedrooms facing the quiet side make the biggest difference here.
Source and method
Summer at this address
Hot area, but this flat has something to set against it.
Hotter than 85 % of residential areas in Wienofficial urban climate analysis (City of Vienna)
In 1030 Landstraße nearly all locations are alike, there is little variation.
What works against it
Source and method
Green and shade
Green space: large park 112 m away · plenty of treesTrees and woody vegetation on 11% of the area within 300 m, private gardens included.
Loading trees …
Source and method
Sources: City of Vienna tree register · parks and woods from OpenStreetMap · tree cover from satellite imagery (Copernicus, 2021 data)
Light & shadows
Future · planned transitTram 18 Schlachthausgasse · around 2026 (850 m)
More on the area →Interested in this listing?
Send a no-obligation enquiry. We forward it straight to DECUS Immobilien.
